Developing Software for Safety Related Systems

Developing Software for Safety Related Systems

Developing Software for Safety Related Systems

by Nadia Hutchings | May 27, 2020

Software systems should always be both robust and reliable, however the moment you introduce a safety element, this need for reliability increases significantly. The level of safety required is governed by the severity and frequency of the hazards identified. Though safety related systems do not have the full responsibility for hazards such as loss of life that safety critical systems do, a malfunction or failure would pose a significant risk to the people involved i.e. the passengers on a train.

Everyone will be aware of software development lifecycles, but there are a few key differences at each stage when developing for safety related systems.

For the purpose of this article, we will be utilising the V-model, which is one of the lifecycles recommended by safety standards such as EN 61508 and EN 50128. Additionally, to further explain the differences covered throughout the article below, we will be utilising the worked example of Driver Only Operation (DOO) camera systems. These systems are utilised in sections of the UK rail network so that drivers may operate them alone without the need for a conductor.

Requirements

A software system's requirements will always be at the heart of any software development, and as such, it is important to define the requirements of a project before starting to write the code. Where the biggest difference makes itself known is in the need for identifying safety requirements.

Safety requirements are the sets of requirements that are defined with the sole purpose of reducing the hazards associated with the project. In the case of our worked example, the hazzard is a passenger becoming trapped in the doors and dragged along the platform, the risk is that the image presented to the driver is not live. A safety requirement for a DOO system would be to ensure that drivers are made aware of instances where images are frozen. Ensuring that drivers are informed when the CCTV footage they are receiving does not reflect the live status of the Platform Train Interface (PTI) is a way of mitigating that risk.

Taking great care to ensure that each safety requirement is both atomic and testable will consequently reduce the risk presented in the remaining development stages.

Design & Implementation

Moving the topic of safety requirements through into the design and implementation phases, you must ensure that each requirement can be traced through into your design specifications. Breaking down all of your designs to at least a component level, is essential so that some else, such as an assessor, can determine that the design will meet the needs of the requirement. It will also allow you to test each component in isolation from the rest of the system. Essentially focusing on a simpler part of the system rather than trying to test the whole thing at once. This, in turn, will help ensure the robustness of the system under test.

Returning to our worked example, in your design specifications, you would outline a process where, in layman's terms, the systems would be expected to compare sequences of frames captured from a camera for the continued repetition of the same frame. By stating this process in detail in your documentation, you will ensure that its functionality will be put under test when it comes to verification and validation activities. It is also important during the design stage to cover aspects such as ensuring integrity of data, particularly stored data, and checking memory etc,as these things can all have an impact on the execution of the software. It is important that if the software fails, it fails leaving the system in a safe state.

Shifting focus more towards implementation, you should also be able to trace your safety requirements down into your developed code. Excess code poses a significant risk to the integrity of your software, as it is most likely not needed and will make the software more complex. In addition there is a chance, albeit a low one, that it will be looked over during testing. So for a given line of code, you would expect to be able to trace it back to a single design statement, which should then be traceable back to a requirement.

It is also during the implementation stage that you should be implementing the combination of applying coding standards and implementing defensive programming.

While the application of coding standards is important for any software development they are mandatory in the development of safety related systems. By applying these standards, you will ensure consistency in the quality of your code, introduce security right from the start of development and help ensure compliance with the relevant industry standards. At this point it is probably worth mentioning the availability of tools, such as static analysis, that can analyse code automatically for defects and points of non-compliance with your coding standard and other industry best practice rules.

Defensive programming practices, e.g. checking for null values and validation of input parameters, helps to ensure the continued function of software under unexpected/unforeseen circumstances. Which in turn all works towards the necessary reliability and robustness.

Verification and Validation

Commonly mistaken as the final stage in the development process, V&V activities should be integrated throughout the whole project lifecycle. You must be able to demonstrate that independent peer reviews have been carried out at every single stage of the development process. While this may not feel like the most valuable use of time, these verification activities provide an opportunity to highlight instances of missing or overlooked requirements, and that nothing extra is added.

A second important factor is the V&V plan. This documentation should be defined and recorded during the very early stages of a project to both describe the V&V activities that will be carried out throughout the project, and demonstrate how compliance with the designated safety standard will be achieved.

As you carry out your testing you should expect to see that every single one of your safety requirements has been met. In terms of our DOO example, you would be expected to force a 'freezing' incident with footage designed for that purpose and expect the software to return a result where the driver is alerted to the incident.

Once all your testing activities have been concluded, the very last thing you would be expected to do is produce a V&V report. The purpose of this report is to confirm that you have completed all of the activities that you outlined in the V&V plan and to provide the justification behind any incidents where a given activity was not carried out. Looking on into the future, if at any point a change is made to the software, a V&V report must be produced for each new version release. Though it may be additional effort, this ensures that the required lifecycle activities have been completed against any changes made and that the system continues to function as expected.

The next big question is, if the techniques outlined in this article produce such reliable software, why don't we apply them to every project? Here at Zircon we have developed a software development lifecycle, that combines the aforementioned techniques to be more agile as well as robust and SIL2 compliant.

References:
How to Choose an Outsourcing Partner

How to Choose an Outsourcing Partner

How to Choose an Outsourcing Partner

by Nadia Hutchings | Apr 13, 2020

Having recognised a need to outsource, and worked your way through the initial preparations, you are now in a strong position to seek out a suitable partner.

Choosing an outsourcing partner is no trivial affair, so taking the time to do your research will undoubtedly be a valuable investment. With years of experience as a trusted outsourcing partner, we have collated some pieces of advice to help you find the best partner for your project.

Do they have the skills needed to complete your project?

There is no point in engaging a partner without the capability to complete the project. Capability is a blend of knowledge, skills and experience, with individual projects requiring varying levels of each component. Some projects will require a higher level of skills, but a lower degree of knowledge, while others could be more demanding in terms of knowledge as skills take more of a back seat. So when you look for your outsourcing partner, you need to look for someone with the right blend for you.

When evaluating potential partners you should try to consider the following factors:

  • the breadth and depth of their technical expertise
  • the expanse of their skillset
  • whether they have access to up to date an relevant technologies
  • whether they can harness their skills, knowledge and experience with excellent project management to solve similar or equally complex challenges

It is an added benefit if you can find a partner who has a broad range of skills, even beyond those you deem necessary for your project, and they have been able to apply them to an equally broad range of business challenges or applications and systems. The more diverse the range of skill application, the more likely they are to think out of the box to resolve issues.

Do they have the skills needed to complete your project?

An organisation's market reputation will tell tales of past successes and failures. It will highlight the reliability of their service, and how they treat their clients. Even if a service provider has access to the latest technological tools and the necessary expertise, you wouldn't want to enter into a long-term relationship with a provider with a reputation for poor customer service.

Much like hiring a new employee, before you go too far down the rabbit hole, ask your prospective partner for references of companies that have previously utilised their services. By following up on these references it is easy to build up a clear picture of the opinions of an organisation. If they can't or refuse to provide references, then this speaks volumes in itself.

What data security measures do they have in place?

Privacy and data security issues are one factor that will prevent organisations from deciding to outsource. During various stages of a development project, you will probably need to share sensitive business information with your chosen partner. If this information is not managed properly then your data is at risk of being mishandled.

Therefore, it stands to reason that you should ensure any potential partners up for consideration conduct regularly scheduled network and security audits. Be sure to double-check if your partner has a suitable approach to data security and their level of capability in it. Do they have ISO27001 certification for instance? Have they been engaged by government offices, and as such have suitably robust data security processes established and in place?

As an additional note, whenever you feel ready to approach a potential partner, an NDA must be in place before any detailed discussion takes place and any sensitive information is shared.

Do they have the processes needed to capture knowledge?

One of the major benefits to be gained from outsourcing over other methods such as contracting is the reduction of future time wastage from familiarisation. A good outsource partner should have the processes and infrastructure required to capture knowledge securely and this knowledge should be cultivated regularly to ensure that it continues to be up to date. They should then subsequently utilise these reserves to ease the onboarding process of new team members.

Are they open with their communication?

A good outsource partner should be willing to communicate with their clients. They need to be able to interact flawlessly with your internal team and should be willing to share regular progress updates with their clients, regardless of their nature. Invariably, even in the most meticulously planned projects, issues can arise. In these situations, clients have a right to know of their appearance so that suitable plans of action can be discussed. A willingness to be open and honest about issues, combined with deciding to share them earlier rather than later, is a good indicator of an outsourcing partner that is seeking to build trust.

During the very early days of any fledgeling partnership, contact points between internal and external teams will be established. A good outsourcing partner will then work alongside you to clearly define and agree upon the necessary communication channels. This will ensure that both parties are clear on who is responsible for what, and who should reach out to who in any given situation.

It is also worth asking them to explain the processes and procedures they follow to track results and risks and resolve any issues. You should ensure that information will be presented in a way that is clear and concise, and that you will be able to recognise how much progress is actually being made.

Are they flexible?

As with planning out new developments, you need to consider the possibility of unexpected issues when looking for potential partners. With this in mind, flexibility becomes an important factor when trying to choose an outsourcing partner. They should be flexible enough to respond quickly to urgent requirements or resolve issues as and when they arise, however they should not be so flexible that any small distraction prevents continued progress.

If you are new to the world of outsourcing, we hope that this series has helped you gain a clearer picture of what the process entails, and what you should expect from a suitable outsourcing partner. On the other hand, if you are experienced in the process of outsourcing, much of this series should be familiar to you, but we hope that you may have picked up some points to ponder over in the future.

Preparing to Outsource: A How to Guide

Preparing to Outsource: A How to Guide

Preparing to Outsource: A How to Guide

by Nadia Hutchings | Mar 19, 2020

So you have recognised a need for external assistance. You have weighed up all of your options and concluded that outsourcing would be the best course of action. Now you are probably wondering what you need to do in preparation before you jump into collaboration with an outsourcing partner.

To help find some answers we have prepared the following guide, written from the perspective of an outsource partner with many years of experience working with people who have already gone down that path.

Before we get down into the nitty-gritty of the body of this guide, we would like to just take a moment to go over some of the slightly less tangible topics.

Be ready to shift your planning process

For many organisations outsourcing is hard. It may sound ridiculous but it is true, and a significant contributing factor lies in the planning.

Under a contracting model, planning could take more of a back seat. Organisations could gather up bodies, place them into a project to get it underway and then deal with the planning factor later on. When it comes to outsourcing, the planning process needs to begin a lot earlier if you hope to get the biggest value in return. If you can approach your outsourcing partner with a well-defined plan identifying which parts of the project you want them to be responsible for, in return, they can provide you with more accurate predictions for their parts of the plan as well as their own understanding of the work and how that may be integrated with the overall project.

You must also consider the fact that it is much simpler to replace an unsuitable contractor than it is to step away from an outsourcing partner. So before you dive in headfirst, take that little extra time to do your research and settle on a partner that you feel confident in. Avoid running like a bull at a gate and ending up in a situation that you come to regret.

Be prepared to shift your mindset

In a similar vein, organisations that have a history of contracting, or that are new to the concept of outsourcing, need to be prepared to alter the way they view their project. What we mean by this is, when you contract you are placing your trust in the person in front of you. However, when you outsource, you are buying an end result and trusting an organisation to get you to that end result.

You need to be clear on exactly what those end results need to be, how they are to be integrated with the rest of the project and how you will verify that they are acceptable as this will need to go into the contract with the outsourcing partner.

Now with that in place, we can at last move onto the heart of the topic at hand.

Define your goals

A true project management basic, but always an important component for any development, is to define what you aim to achieve by the conclusion of your project. By establishing a clear understanding of your end goal, you will be able to efficiently communicate your ideas to both your internal team and eventually to your outsource supplier. The higher the degree of clarity, the lower the risk of miscommunication or misunderstanding between both internal and external resources.

Assign roles and responsibilities

Assigning management roles and their responsibilities while a project is still in its infant stages is another means of improving clarity and communication. Getting this structure in place provides both your internal team and the external software engineers with visibility of who they should report to for the duration of the development, and who needs to be updated in regards to the progress of the project. The end result should be a unified team, consisting of both internal and external resources, that have clear demarcation of responsibility and an understanding of where knowledge lies. With this in place then you should be rewarded with a higher level of productivity, key to ensuring that project deadlines are met.

Select your tools

While you will obviously need to prepare your new outsource partner for working on your project, you also need to prepare your team for working with your new partner. An easy first step towards this cohesion is to identify and outline the tools that will be used throughout the process.

Project Management

For the purpose of consistency, you want to find a PM solution that everyone involved in your project understands how to use. Online tools such as JIRA, Trello and Basecamp are popular and come with their own specific advantages. Regardless of which tool you end up selecting, a process of use should be outlined and agreed upon with your outsourcing partner to maintain consistency.

Document Sharing

Your team members time will always be best spent actually working on progressing the project towards its end goal. You don't want them to be wasting time searching various platforms and neverending hierarchies of folders for specifications and other crucial documents. Setting up an agreed document-sharing platform beforehand, be it specific to your organisation or, at its simplest, a more generic tool such as Dropbox or Google Drive, can help prevent this unnecessary time slippage.

Seek out dependencies and obtain all the required accesses

Dependencies are a frequently overlooked factor that can lead to avoidable idleness within your new external partner as they wait on your IT or engineering departments. Before starting your cooperation, it may be beneficial to create a checklist of all the resources that the external team should have access to. This will be things such as code repositories, tools, target hardware and test equipment/simulators.

When developing and implementing features to a solution that is already active in a production environment with real users, you may wish to consider preemptively preparing a staging environment. Unless you are willing to account for this set up in the work expected from your partner, having this structure in place will reduce their development time and may help to keep costs low.

Coordinate Management

It is worth remembering that your outsourcing partner will care about your particular success. They are there to assist you with your development in any way they can, so you may find it beneficial to open yourself up to listen to suggestions if they are offered. Incorporating the views and opinions of all members of the team, both internal and external, increases the chances of critical factors not being missed. An outsource partner may bring that 'fresh pair of eyes' that enables processes to be improved and efficiencies gained that might be missed by an internal team that can't see 'the wood for the trees'.

Consider a post-development strategy

Amongst the relative chaos of starting a new project, it is easy to focus on the immediate problem of getting the development underway and forget about what will happen upon its conclusion. Who will be maintaining the product following its implementation? Will your staff need any kind of training from your outsourcing partner? How will you phase out the involvement of external team members? When engaging an outsourcing partner it may be worth considering these questions to help ensure that the handover process is as seamless as possible. A good outsource partner should also be willing to assist you in outlining and implementing a handover plan.

Hopefully, this guide will help you with your outsourcing preparations and you feel more relaxed with how to approach this process. For the next and final addition to this outsourcing series, we will share a few tips and tricks to help you find a top-notch partner that will suit the needs of your organisation.

Why do people outsource?

Why do people outsource?

Why do People Outsource?

by Nadia Hutchings | Mar 11, 2020

Throughout our years of operation, we have had the opportunity to help many different clients realise the software components of their business goals. As one can imagine, to reach the position that we find ourselves in today, we have had to make our way through the process of approaching potential client's more times than we could hope to keep count of. However, one thing that has continued to stand out is the repetition of a single phrase, 'We have an internal team so we will never need to outsource'.

While the preference for many organisations will be to keep development work within internal teams, we know from experience that there are times when external assistance may need to be considered. So now this begs the question, what are the reasons that could drive an organisation to outsource a development?

For the most part, we have found that the answers to this question fall into one of two categories:

Lack of Internal Resources

Resource limitations are a big driving factor behind many organisations deciding to reach out for additional help. It may be that all existing teams are already tied up with the delivery of tasks that are equal or even greater in terms of priority. Maybe your team is too small in number to deal with a brief but rapid increase in demand, or a tight deadline will not provide you with the opportunity to bring in additional resources to meet the required demand.

Lack of Expertise and Skills

Maybe you have access to a suitable quantity of bodies but have found yourself facing a gap in the knowledge of key skills or experiences with a specific technique. Alternatively, a project may end up forcing internal specialists to complete work away from where they would give the most value, and having an external resource to provide the groundwork would help improve efficiency.

But why would I choose to outsource over other options such as contracting?

Of course, outsourcing is only one option out of many. Contracting has historically been a popular approach for dealing with many of the issues we have highlighted above, the foremost reason being the perceived lower cost. So why would an organisation decide to outsource over this alternative?

Scaling is easier when outsourcing

A big issue with contracting is that for each new body you bring onto a project, you face fundamental yet troublesome problems such as the availability of office space and key hardware and the overhead of management. By making the decision to outsource, this responsibility will be shifted onto your selected outsourcing partner.

There is a consistency in approaches to development

A notable risk of bringing in significant quantities of independent contractors is the potential for inconsistencies in development approaches. While coding standards will help to manage this risk, you will be bringing in individuals who have their own unique approaches and preferences in how they work. By reaching out to an outsourcing partner, you should be able to place trust in the fact that they will expect a level of quality from their employees, which will help ensure consistency in their approach to development. Not to mention that quality assurance processes should be in place to ensure that this is the case.

You gain access to a diverse skill set across multiple IT disciplines

While contracting will limit you to the experience of a single person, when you outsource you gain the knowledge and expertise of a team. Just because a particular individual hasn’t been offered as a resource for your project doesn’t mean that they will not offer their advice or insights to those who are.

Outsourcing offers ready access to a team of people with the capacity to share knowledge and train other team members. So should one engineer become unavailable, there will already be another capable of filling this space, and the overhead of doing is this is born by the supplier not by the client as is the case when a contractor leaves.

It can be a cost-effective way to manage spikes in demand

When taken at face value, contracting can certainly seem more appealing in terms of costs. However, in cases where time would be wasted on familiarisation to bring in new contractors, outsourcing really begins to come into its own. Companies like Zircon are well placed to, collate key project experience and information into a knowledge base to aid the onboarding of new employees, as well as take the impact of staff movement within project teams away from your organisation.

There is also value in highlighting the fact that the cost-effectiveness of outsourcing only continues to increase as resource numbers continue to grow. While individual contractors attract a cost for the time spent getting up to speed, this cost is often reduced for an outsourced team as it tends to be carried by the supplier.

You gain a weapon to battle the headache that is management

By opening up a relationship with an outsourcing partner, you gain the opportunity to relieve yourself of the responsibility of the day to day management. It will be up to your chosen company to ensure progress is maintained, in turn allowing more time for key business activities.

Of course, even in the face of all these benefits, there is very little point in outsourcing a piece of work if you will be spending four out of seven work hours communicating with your outsource partner.

Already Looking to the Future: Where Do We Go Next?

Already Looking to the Future: Where Do We Go Next?

Already Looking to the Future: Where Do We Go Next?

by Nadia Hutchings | Feb 20, 2020

Over the last couple of months, we have shared our journey to develop and implement a more flexible approach to project management. We have shared how a combination of Agile and Waterfall allowed us to overcome the challenge of our business environment. We have shown how we were able to drive adoption through the definition of critical success factors, and we have explained how active portfolio management will ensure the health of all our in-flight projects.

Now, as we stand at the finish line, we are already looking to the future. Now, as we stand at the finish line, we are already looking on to the future. Having implemented our new solution, our drive for continuous improvement kicks in once more. As we finish refining one area, another becomes a candidate for improvement. Are there any elements that have the potential to grow? Are there any areas that still need refining?

Could we be more Agile?

When we began the process of developing our new approach we were certain of one thing, we wanted some degree of agility.

For this initial improvement phase, we maintained an emphasis on continuing to use Waterfall but with the addition of Agile elements. This meant we would continue to view systems as a whole, planning the entire development upfront and working through to verification and validation. Maintaining this element of rigidity and preemptive planning helps ensure the traceability required for systems that require a safety case.

Though the adoption of certain ceremonies has allowed us to become more Agile, the agile movement has a lot more to offer than we are currently using. Our desire to become more agile challenges us to deliver value, that is in terms of working software, to customers as early as possible. It questions the approach of specifying everything upfront, building large chunks of software, testing it all upfront and taking a long time to do it.

Would we be able to determine an alternative, agile process that could be applied to particular project types? Could we still develop robust, safety-critical systems if we were to develop them as a series of 'features', i.e. slices of working software? If proven to be possible, we would be delivering features to customers for them to view and test earlier, rather than having them wait longer-term for whole components to be developed and integrated.

Could we introduce more DevOps to reduce cycle time?

Continuing in the same vein, we may attain greater value in embracing more DevOps principles in order to reduce cycle time.

One aspect of DevOps that we have an interest in adopting is that of Continuous Integration and Continuous Deployment.  Where newly developed code is regularly merged into a central store and automated builds and tests are run and deployed in either a testing or production environment.  If implemented correctly, the team will always have a deployment-ready item that has successfully passed through a standardised testing process.

Would we be able to implement a process that allows us to integrate and deploy our software at more regular intervals, and allow our clients to see functional software more frequently?  However, we are already aware of a few potential challenges.  For example, how could this process be applied when working with embedded systems, where software has to be flashed to devices?

What can we add to our critical success factors?

As we said in our article covering our use of critical success factors, we decided to limit the quantity of our initial factor set to ensure a successful change. Through continuous consolidation, their application has now become second nature for all of our engineers.

Having reached this point of consistency, we can begin the introduction of the additional factors in a continuous cycle, constantly running through the process of identifying an area for improvement, implementing and embedding the change to reach a point of consolidated consistency before looking on to the next thing.

Following the success of this initial improvement process, we are keen to keep the momentum going and push for even more. However, we will have to take care to strike the right balance between improving the process and just following it, recognising that it is "good enough".

Portfolio Management: The Final Hurdle

Portfolio Management: The Final Hurdle

Portfolio Management: The Final Hurdle

by Nadia Hutchings | Feb 11, 2020

Through our continuous improvement initiatives, we identified aspects of our approach to project management that could be improved upon and took on the challenge of developing and implementing a series of improvements. To meet the needs of our diverse business environment, we combined the traditional waterfall model with a select number of Agile ceremonies.

With a clearer picture of how to proceed, we needed to unwind years of learned behaviour to ensure the successful adoption of our new approach. Our solution was to define a set of factors that we believed to be critical to project management success to set a benchmark for assessing adherence.

With a large proportion of our initial journey behind us, it was time to address the 'final' hurdle.  Ensuring our new approach is applied consistently across our entire project portfolio.

While our critical success factors help us drive the adoption of the right behaviours, they alone can't provide an overarching view of every currently active project. To ensure that we don't lose sight of the overall state of affairs, we wanted to outline our method to actively manage our project portfolio (a term we use to refer to the total collection of our in flight projects).

Building Strong Foundations

The very first course of action towards a management solution was to formulate a consistent and accurate inventory of all in-flight projects. Historically, we have always had a good internal understanding of which projects are being worked on, however, we wanted to implement an agreed and centralised list of which projects are active, which are closed and which are yet to start. Without such a structure in place it is easy for there to be several different views of what state a project is in. By maintaining a list we would create a single version of the truth and achieve an improved level of clarity. Even if it may sound like an obvious place to start, we needed to establish a strong ground on which to build the rest of our approach.

Diving Down into our Project Portfolio

All current projects are evaluated during a weekly project review, which underpins our portfolio management process. The objective of the review is to ensure all participants, which include members of the board, share a common and consistent view regarding the status of each project and that there is agreement on necessary issue resolutions and risk mitigations.

The Support Behind the Deep Dive

To help secure a productive meeting, we utilise a portfolio dashboard to maintain focus and ensure attention is drawn to areas that need to be addressed. Unlike the project inventory, this dashboard shows the projects alongside red-amber-green (RAG) statuses that reflect the condition of key project considerations such as:

  • Purchase order cover
  • Quality
  • Delivery to cost and time
  • Resourcing
  • Issues and risks

To get the biggest benefit out of the dashboard, we must be able to understand and trust what each RAG colour is reporting. Therefore, it stands to reason that having a standard definition for each consideration will drive reporting consistency across the dashboard.

Making an Active Change

In addition to an updated portfolio dashboard, one of the outcomes of the weekly project review is a set of specific remedial actions agreed by Senior Zircon Management and Directors. Where a condition is given either an amber or red RAG score, potential resolutions are discussed and actions to address any underlying issues are agreed upon.

Much like the tasks in JIRA, each action will be assigned to the appropriate individual, who is responsible for ensuring its swift completion. Previous actions are reviewed during the deep dive to confirm their completion, and those unable to be completed are subsequently escalated.

Where many companies follow through on this process, it is all too easy for actions to get lost amongst the day to day activities. The act of assigning responsibility, and as a result ownership, helps maintain their visibility.

Directing Resources where they are needed

In tandem with the weekly portfolio review, a separate meeting is held to review staff allocation to projects. The purpose of this meeting is to ensure that engineers are allocated most productively, to ensure the successful delivery of the entire portfolio. Where one project ramps down we can pre-emptively reallocate resources to where they are most needed. Project managers can utilise this as an opportunity to make sure that their projects are adequately resourced, and decisions can be made about where best to deploy resources to best optimise delivery across the portfolio. The key is in balancing resource supply and demand from the whole portfolio perspective and not from the particular demands of individual projects.

With this final process in place, we had all of the infrastructures behind our new approach and could begin its implementation. In the next and final entry to this project management series, we turn our attention to the future. Though we may have met our initial goal, there is still the potential for further development and continuous improvement.