Tried and Tested: Can Open Source Boost CCTV into the 21st Century?

Tried and Tested: Can Open Source Boost CCTV into the 21st Century?

Tried and Tested: Can Open Source Boost CCTV into the 21st Century?

by Nadia Hutchings | Aug 11, 2020

With funding from the UK's innovation agency, Innovate UK, Zircon Software Ltd is working to find out whether security surveillance systems and associated analytics can work in a station environment without disrupting the rail network. To achieve this, Zircon are planning to utilise advanced video analytics, taking functional open source Machine Learning libraries wrapped in bespoke software, to boost the efficiency of established CCTV systems.

Though cameras produce streams of data while filming, the systems that sit behind them need modernising to keep up with the video capability that large scale CCTV operations can offer. Currently, video data is used as additional support for incidents that are witnessed on location. The Innovate UK challenge aims to develop a system capable of automatically detecting potential passenger/rail safety issues, intending to enhance manual control room activities and station security and safety as a whole. The vision is to have video data inform control room operators of potential problems as and even before they occur.

Rather than reinvent the wheel, Zircon engineers have begun the process of engineering a bespoke statistical analytics engine that will pull together some of the best open-source tools from successful Machine Learning projects, such as TensorFlow. Instead of imitating a Harry Potteresque invisibility cloak with this technology as the TensorFlow.js team have done, these technologies will be utilised to raise alerts and reports on behaviours such as loitering, abandoned objects and crowd trend analysis.

Zircon is expecting that the utilisation of successful open-source software and other suitable toolsets will greatly reduce the time required to bring a prototype into a reality, and will reliably reduce response times for dealing with incidents.

Though specific to the rail centre, there is some excitement surrounding the outcome of this challenge and its potential implications for other industry sectors with control room environments.

About the Competition

The SBRI programme uses the power of government procurement to drive innovation. It provides opportunities for innovative companies to engage with the public sector and gain contracts to solve specific problems. Competitions for new technologies and ideas are run on specific topics and aim to engage a broad range of organisations.

Two new SBRIs have been announced to drive efficiency and safety in the rail industry. Network Rail will work with Innovate UK, part of UK Research and Innovation, to invest up to £3m to address two of the objectives identified in Network Rail’s CP6 funding strategy for research and development:

  1. Automated tunnel examination
  2. Security surveillance analytics for stations

Zircon has won a place in the competition to develop a security surveillance analytics solution for stations.

This is the first phase of a 2-phase competition. In the first phase, companies are expected to develop and demonstrate their analytics system using pre-recorded data.

About Zircon Software Ltd

Founded in 2000, Zircon Software provides software engineering consultancy and development services to clients across industries that are characterised by the use of high availability/safety-critical systems and applications.

Our main focus is on helping our clients navigate their way through the process of developing their software products, regardless of whether they be embedded, PC or Cloud based, via our four key service areas:

  • Helping to build robust software solutions
  • Providing advice on how to improve software development capabilities
  • Assisting with the capture and recording of requirements
  • Helping clients ensure that their software products are built correctly according to specifications.

About Innovate UK

Innovate UK is the UK’s innovation agency. It works with people, companies and partner organisations to find and drive the science and technology innovations that will grow the UK economy.

For further information visit www.innovateuk.gov.uk.

Quality – An Aid to Produce Consistent Rubbish

Quality – An Aid to Produce Consistent Rubbish

Quality - An Aid to Produce Consistent Rubbish

by Nadia Hutchings | Jul 24, 2020

Another year has passed, and myself and a colleague have hosted a BSI auditor for our annual ISO9001/TickITplus check-up, and in fact this was more than the regular check, in that it was our 3-year re-certification audit, the biggie!

So why do we do it!? Why spend the time, effort and money on it? ‘Because it is what our customers expect’, true, but our processes and procedures go beyond what is required for the standard. The actual reason is simple, it makes us better, and has helped us improve as a business over the years and benefit from increased cost effectiveness by doing things right, first time.

In the beginning Zircon was process-less, but that was day one. Not long after that, Zircon underwent one of its first strategic initiatives, the creation and adaptation of a TickIT/ISO 9001 quality system. Our first Quality Manager achieved an amazing feat by getting this in place and accredited in less than a year! And this was not a system we bought in, this is one that was developed and tailor-made for the business. Over the years we have built on this, though our policy of continuous improvement and innovation in how we work, and it has continued to serve us well, but will never stop moving forwards. We were also one of the first companies to achieve accreditation for both ISO9001:2015 and TickITplus.

But quality, it is just ticking boxes, right?! Sadly, in our industry I have seen that a lot. Engineers jumping through hoops just to satisfy an auditor/approver. Often the organisations with this attitude are finishing the ‘work’ (and it has usually been a painful journey…), and then going back and ‘tidying up’! As a Quality Manager (and a director of the business), the idea of ‘tidying up’ is one that makes me angry! The systems and process are designed to be efficient and effective if they are followed in the defined order, often going back and fixing things leads to little benefit, other than pulling a fast one over the auditor. Doing it like this is also a sure way to make it feel like ticking boxes to all those involved. You also get the downsides of people reinventing the wheel all over the place, things being missed till much later in the process and the additional cost of people struggling with it.

Quality Systems are not a one-size fits all, they need to be developed and continuously evolved to meet the changing needs of the individual business and to be improved through learning and reflection on how to do things better. The Processes need to be efficient and effective and not be endless red-tape.

But how do you drive this improvement? There are two main ways, the first it to look at the things that go wrong. At Zircon we call them incidents, these can be quality deficiencies, complaints, or faults. When one of these occurs, we first look to correct the issue, but then we take a step back and identify the root cause. Doing this allows us to look for opportunities for improvement, we refer to this as preventative actions. The application of these is monitored over a period of time to ensure that we are achieving the benefits of the change.

The second source of improvement comes from the staff themselves. It is important that every member of staff is encouraged to carry out reflective practice, looking for ways we can do things better. In fact this is one of the core values of the company, innovation. They are best placed to eliminate waste, by identify the red-tape, and inefficiencies in the work they are doing and have the best to offer in terms of ways they can work better. This practice also helps to reinforce the importance of the processes, so you get a double whammy!

And then you have the external audits themselves, be it by accreditor or customer. These are great opportunities for someone outside the business to take a look at what you are doing and give feedback and a different perspective, and often details about how other organisations are doing things. I have never failed to learn something from an external audit.

So how did our audit go? Not bad at all, we had 4 minor non-conformities, all of which are very much ways for us to improve as a business! The identification of these makes it more than worth sitting through the audit! I look forward to more next year!

The Hazards of Legacy Systems

The Hazards of Legacy Systems

The Hazards of Legacy Systems

by Nadia Hutchings | Jul 8, 2020

Being the owner of a software system with a dedicated customer base sounds like the kind of position one would like to find themselves in. At least until it gets superseded and you have to face dealing with a legacy system.

Many developers have a strong dislike of legacy systems and consider them problematic for a variety of different reasons.

Reliance on Antiquated Hardware

Software running on antiquated hardware can rapidly become a heavy expense, potentially going so far as to outweigh the cost of replacing both of the software or hardware elements. If some form of emulation or backwards compatibility allows the use of new hardware, this cost can be minimised.

Deterioration of Retained Knowledge

As staff rotate through, it can become increasingly difficult to maintain and expand from a lack of understanding of the system. Staff who were considered experts have retired or moved on. New staff entering the field since the transition to legacy won't get to experience it in the first place. Documentation will, of course, assist in filling the gaps, but even the most detailed documents will not quite make up for the first-hand experience.

Holes in Security

There are a lot of vulnerabilities that can arise from legacy systems. Older operating systems and applications can suffer from a lack of security patches as support eases. Production configurations of these operating systems can also contribute to security concerns. Both of these factors and more have a hand in putting legacy systems at risk of being compromised.

When New Meets Old

You have to consider the issue of integration. Integrating with other systems is part and parcel of software development, but ensuring successful communication between older and newer technologies can be incredibly difficult.

Fixing Bugs Can Cause More Problems

The biggest concern for many developers is the greatly increased risk of introducing more problems during the process of bug fixing or making enhancements. In many cases, problems will manifest themselves in areas outside of where changes have been made and can be easy to overlook.

As part of our experience as a company, we know first hand just how troublesome having to deal with a legacy system can be. However, we also know that it isn't impossible as the guide below will demonstrate.

Updating A Legacy System Guide to Avoid Disaster

1. Impact analysis – what else could be affected? Are the possible consequences worth the advantages of the change?

2. Test the system before you do anything – make sure that you completely know the behaviour of the current system before you do anything. That way you avoid chasing your tail looking for a problem that you think you’ve introduced but is in fact a feature of the system.

3. Source control – make sure you have everything saved that will enable you to return to the current build should a disaster occur.

4. Review the proposed changes – walk through the changes before doing anything. Two heads are better than one, especially one that has been bashed against a wall of old, poorly documented code!

5. Change carefully – make sure that you are not overwriting data areas, mark all changes, check uniqueness of new variable names, understand inputs and outputs.

6. Test the change thoroughly – make sure the change is robust and provides the required functionality.

7. Regression test – make sure that the old functionality still works correctly. This is tedious and may have been done several times over the lifetime of the system. Automation will help.

8. Document – you’re not writing an essay, just some notes to help the next person that will have to change things. It may well be you! Write down what you were trying to do, what you actually did, was the existing documentation any good and what you managed to find out. Eventually, these notes will be better than the original document

How to Test Without Access to The Test Environment

How to Test Without Access to The Test Environment

How to Test Without Access to The Test Environment

by Nadia Hutchings | Jun 22, 2020

In many of our previous articles, we have expressed the importance of achieving a high standard of testing. Potentially blocking this achievement, several factors can come together to affect the quality of your testing, factors that include your test environment.

As the virtual office that forms an essential part of any testers working day, a well-built test environment will allow a developer to simulate the conditions that a system will, and could, experience once moved into operation. However, it is not unusual for a developer to be without access to their test environment.

It may sound bizarre, but there are a great many reasons as to why access to a test environment may be limited or not feasible, for example:

  • The required hardware is still in development alongside the software, and as such is not ready for testing.
  • Due to their tendency to be expensive, it may not be feasible to provide every team member with a development prototype.
  • The hardware involved is simply too large, either physically or in terms of quantity to fit into an office space.
  • Physically large - a train and/or carriage
  • Large in quantity - a train CCTV system comprising of a multitude of cameras
  • Certain industries and systems will have security restrictions in place that could form a barrier to the test environment.
  • Where working as one of many subcontractors, an agreed interface may be used until subsystems are brought together towards the end of the project
  • In addition to all the issues associated with lack of access, sometimes it can be easier to test elements of an embedded system within a non-target environment, such as the PC based testing within the development environment.

So what happens if a tester were to find themselves without ready access to this space?

Mock Environments

Looking at a dictionary definition of the word mock (noun) you should expect to see something along the lines of 'something made as an imitation' or 'not real but appearing or pretending to be exactly like something'.

In the case of mocking, you are attempting to create an object or unit, that imitates the behaviour of a real object or unit. To put it simply, if your software has a dependency on other pieces of software, you can mock those interactions to establish if your code is reacting as expected to both valid and invalid inputs. This last point is important to highlight here as it shows one of the major advantages of mocking. When it comes to testing in the real world, with the actual hardware or 3rd party software, it can be difficult to create invalid conditions, but by using mocking you are able to ensure that these situations are dealt with gracefully.

In regards to the focus of this article, primarily used in unit testing, mocking can provide an interim means to exercise code within a development environment. After all, it shouldn't matter if behaviours are being faked, code should react the same way to faked/mocked inputs as it would to those that are real. Catching bugs and issues during Unit testing also saves time later in the project as debugging issues at the system level can be more time consuming.

Simulators

Returning to the dictionary once again, a simulator is defined as 'a piece of equipment that is designed to represent real conditions'. In the real world, pilots have simulators to mimic the experience of flying without the risk of damage from a crash. In software, most commonly in system testing, simulators will act like the various subsystems that your software will have to communicate with.

Designed to supply a realistic interface, a simulator will mimic the various interfaces in such a way that your software will not know it is talking to a simulator. As far as it is aware the software is in a live environment, and as such is receiving real messages.

For example, for a train control system (TCS), if your code were to send out a request to increase motors to x%, you would expect two things to happen. One, the simulator returns a realistic response to the request that is either positive or negative. Two, that your code responds appropriately to the simulators response or, in the worst case scenario, that it fails safely. Of course, this is an oversimplification of a very complex system, only focusing on one specific interaction between two interfaces. In reality, a simulator for a TCS would have to replicate a multitude of subsystems to ensure a realistic environment.

Mocking and simulators are cost-effective solutions to the issue of test environment access, however they will not totally replace testing on real hardware, or interfacing with real systems and users. They have a time and a place all throughout the life of a project, and even into the operational maintenance carried our post delivery, but there is still a need for testing in the actual environment. It is also worth considering the added bonus that simulators can double up as training tools to be used as part of training environment set up.

Lets Talk Software Testing

Looking for support with testing requirements, particularly in regards to the development of mock software and simulators? Get in contact with our team here at Zircon, and it would be our pleasure to see how we can assist you.

The Technical Workshop – How To Make Them Work For You

The Technical Workshop – How To Make Them Work For You

The Technical Workshop - How To Make Them Work For You

by Nadia Hutchings | Jun 17, 2020

Anyone experienced in product design will understand just how valuable a facilitated workshop can be. Bringing together a project's key stakeholders into a single space allows for the exploration of diverse opinions and ideas, while simultaneously striving to achieve "consensual validation".

Software systems are typically built with support from a large network of stakeholders. You have your product owners, multifaceted development teams, service providers such as Zircon and of course your end-users. By bringing these groups together, you will be bringing together people with differing opinions, interests and agendas. Taking this into account, it is hardly surprising that the facilitated workshop can be a powerful asset in the development process.

Here at Zircon, we have utilised workshops on a number of our projects to gain a clear understanding of expectations for the system under development. For example, as part of a project to develop an Android application, we implemented a series of workshops with the end-user to establish the suitability of our mocked up prototypes. For another project to capture the requirements of a new rail signalling product, our team facilitated several workshops to understand stakeholder expectations for the system and how it would be used and its integration with the client's wider system (or portfolio of products).

A successful and productive workshop can be both fun and energising. However, when a workshop is poorly planned or badly run it can be incredibly damaging. The "best" worst-case scenario is an unnecessary waste of precious time and resources, however, the results can be as extreme as damaging vital relationships or project derailment as political agendas play out. So to help you ensure that your next workshop will be a resounding success, we have outlined some pointers to guide you in the right direction.

Determine and define the purpose of the workshop

If you are considering the implementation of a workshop, you must have some idea of a goal that you would like to achieve. Before you approach a potential audience, you need to define what that goal is, as it is impossible to reach an agreed endpoint if you haven't taken the time to define what that endpoint is.

Start with a few sentences to explain your reasons for hosting the workshop, almost as if you are sending out a calendar invite.  You can then expand on this to articulate what you are attempting to achieve, and how the world will be a better place after the completion of the workshop. Try to articulate your concrete aims for the outcome in the form of actions. For example:

  • Identify and agree on the safety hazards of the level crossing CCTV system
  • review the proposed mobile app user interface prototypes
  • agree the elements to be incorporated in the final prototype

When you finally do decide to reach out to your attendees, you should explain why they are being invited and what you will expect them to contribute during the workshop.  If you are expecting them to prepare ahead of time, i.e. read any documents relevant to the outcome of the workshop or be prepared to make a short presentation, you should also make this clear to them.

Choose a healthy mix of attendees

Your audience will have a direct impact on the quality of your workshop. Unfortunately, you can't just invite the individuals that you know will play nice and make life easier, the need for their involvement will single-handedly depend on their ability to contribute to your workshops outcomes. Take the time to look over the purpose that you have outlined, this will define which stakeholders are key and those that will have no valuable input and simply increase the risk of derailment and distraction.

As an additional note, ensuring that attendees are empowered to make decisions regarding the objectives of the workshop will help ensure that progress is made, and avoid the creation of an echo-chamber in which ideas are bounced around but a lack of approval prevents progress on those ideas.

You also need to be aware that most of the attendees invited to the workshop will be keen to promote their agendas and ideas. In being aware that certain participants will attend with preconceived attitudes to the problem, and maybe even other attendees, you can address them early on in the workshop plan.

Be cautious of the size of the group

While you will want to achieve diversity in your attendee list, you want to avoid going too crazy with theinvites to the point that you have a town hall meeting on your hands rather than a workshop. Considering that the purpose of the workshop is to achieve a mutual agreement, you don't want to put yourself in a position that could jeopardise that goal. However, there is no clear cut answer as to the ideal number of invitees, as this will depend he avily on the purpose of your meeting. If you are finding that you are bringing too many people to the table, you need to consider modifying the purpose rather than downsizing the numbers.

As a general rule of thumb, the bigger the discussion group, the harder it will be to reach a unanimous decision. That being said, several workshop management techniques can be employed when dealing with larger groups. These techniques can be demanding and take a lot of work but it can be done if the workshop requires it.

Outline some ground rules

To help ensure smooth sailing, you should be applying a set of principles for the duration of your workshop, for example:

  • One person talking at a time.  No having multiple conversations while the workshop is in session.
  • No mobile phones.  Breaks will be offered for you to catch up on emails and calls.
  • Respect one another.
  • This will be a 'safe' environment and there will be no such thing as a bad or silly idea or comment, all input will be valued.
  • The facilitator apologises in advance for cutting off speakers and stopping discussions mid-flow.  We appreciate that this may appear rude, but it is the facilitator's job to keep the workshop on schedule.

These principles will help to maintain acceptable behaviour, promote the overall goal of the workshop as well as serve as a process guide.

Work with your group to establish and agree upon principles that are clearly defined and acceptable to all participants. As the facilitator, you are first and foremost responsible for monitoring the adherence to these principles.

Carefully manage the characters

Once the workshop is underway, one of the facilitator's many roles is to ensure that each participant is offered the chance to have their voice heard. There is a careful balancing act between gently subduing strong characters who push their agenda and trying to engage those who are more passive and hold back on putting their ideas across.

There will be times where a facilitator will have to employ techniques, or exercises, that will help prevent the conversation from stalling. Whether this is to pull more introverted members into a discussion or to ensure that the thread of discussion stays on track.  For example, to try and engage those who may be nervous or reluctant to speak you may benefit from running a warm-up exercise when all attendees have gathered. Examples of particularly useful exercises include:

  • Leave-your-baggage at the door
  • Share one positive and one negative
  • Change up the style of voting/option ranking

If you feel a conversation beginning to enter that never-ending circle, it is the role of the facilitator to break the cycle and refocus the group on the workshop's goal.  You need to try and get those in the debate to articulate the areas where they agree and recognise exactly where they disagree.  For example, the facilitator could say something along the lines of "so I hear you, person A, saying this ..., and I hear you, person B, saying this ....  You both seem to be agreeing on this point ... but are disagreeing on this point ..., how could we bridge this gap?"

Take Frequent Breaks

It may not always seem like an intensive experience, but a workshop demands a lot of focus from its attendees. Considering the limited time frame and availability of the individuals involved, you may not want to risk taking time out of your allotted schedule but to maintain productivity and focus brief regular breaks are beneficial. These breaks can also be more than simply for comfort, i.e. topping up drinks or making visits to the bathroom, they can be offered as an opportunity for busy attendees to check on their emails or make a call. If you provide these opportunities, you will simultaneously build a better connection with your attendees and minimise their distraction during the focused sections of the workshop.

The workshop doesn't end at the door

Once all the discussions are over, you need to remember that even though the meeting may be over, the workshop doesn't end once everyone is out of the room. Writing up and publishing the notes generated during the workshop, so that participants have the means to remember what was discussed and agreed upon. You should also make sure to accompany these notes with a list of actions and next steps that make it clear who owns each task and the date for completion.

By having a common point of information for all participants to refresh their memories, you remove the risk of conflicting accounts and improve productivity through task ownership.

So to quickly summarise, your workshop should have a clear objective and you should have invited the right participants who are empowered to make the necessary decisions. Your invite should be clear and ensures that invitees know what the workshop is for, why they are being invited and what their role is. Your workshop should be designed to address anticipated sticking points, overcome obstacles and move towards achieving the objective. And finally, you should utilise good workshop facilitation to keep the session moving, to build collaboration and consensus between participants, keeping the workshop to schedule and achieving its objectives. Put yourself in a strong position where your preparation and processes will allow participants to be active, engaged and committed to completing the task.

References:

Developing Software for Safety Related Systems

Developing Software for Safety Related Systems

Developing Software for Safety Related Systems

by Nadia Hutchings | May 27, 2020

Software systems should always be both robust and reliable, however the moment you introduce a safety element, this need for reliability increases significantly. The level of safety required is governed by the severity and frequency of the hazards identified. Though safety related systems do not have the full responsibility for hazards such as loss of life that safety critical systems do, a malfunction or failure would pose a significant risk to the people involved i.e. the passengers on a train.

Everyone will be aware of software development lifecycles, but there are a few key differences at each stage when developing for safety related systems.

For the purpose of this article, we will be utilising the V-model, which is one of the lifecycles recommended by safety standards such as EN 61508 and EN 50128. Additionally, to further explain the differences covered throughout the article below, we will be utilising the worked example of Driver Only Operation (DOO) camera systems. These systems are utilised in sections of the UK rail network so that drivers may operate them alone without the need for a conductor.

Requirements

A software system's requirements will always be at the heart of any software development, and as such, it is important to define the requirements of a project before starting to write the code. Where the biggest difference makes itself known is in the need for identifying safety requirements.

Safety requirements are the sets of requirements that are defined with the sole purpose of reducing the hazards associated with the project. In the case of our worked example, the hazzard is a passenger becoming trapped in the doors and dragged along the platform, the risk is that the image presented to the driver is not live. A safety requirement for a DOO system would be to ensure that drivers are made aware of instances where images are frozen. Ensuring that drivers are informed when the CCTV footage they are receiving does not reflect the live status of the Platform Train Interface (PTI) is a way of mitigating that risk.

Taking great care to ensure that each safety requirement is both atomic and testable will consequently reduce the risk presented in the remaining development stages.

Design & Implementation

Moving the topic of safety requirements through into the design and implementation phases, you must ensure that each requirement can be traced through into your design specifications. Breaking down all of your designs to at least a component level, is essential so that some else, such as an assessor, can determine that the design will meet the needs of the requirement. It will also allow you to test each component in isolation from the rest of the system. Essentially focusing on a simpler part of the system rather than trying to test the whole thing at once. This, in turn, will help ensure the robustness of the system under test.

Returning to our worked example, in your design specifications, you would outline a process where, in layman's terms, the systems would be expected to compare sequences of frames captured from a camera for the continued repetition of the same frame. By stating this process in detail in your documentation, you will ensure that its functionality will be put under test when it comes to verification and validation activities. It is also important during the design stage to cover aspects such as ensuring integrity of data, particularly stored data, and checking memory etc,as these things can all have an impact on the execution of the software. It is important that if the software fails, it fails leaving the system in a safe state.

Shifting focus more towards implementation, you should also be able to trace your safety requirements down into your developed code. Excess code poses a significant risk to the integrity of your software, as it is most likely not needed and will make the software more complex. In addition there is a chance, albeit a low one, that it will be looked over during testing. So for a given line of code, you would expect to be able to trace it back to a single design statement, which should then be traceable back to a requirement.

It is also during the implementation stage that you should be implementing the combination of applying coding standards and implementing defensive programming.

While the application of coding standards is important for any software development they are mandatory in the development of safety related systems. By applying these standards, you will ensure consistency in the quality of your code, introduce security right from the start of development and help ensure compliance with the relevant industry standards. At this point it is probably worth mentioning the availability of tools, such as static analysis, that can analyse code automatically for defects and points of non-compliance with your coding standard and other industry best practice rules.

Defensive programming practices, e.g. checking for null values and validation of input parameters, helps to ensure the continued function of software under unexpected/unforeseen circumstances. Which in turn all works towards the necessary reliability and robustness.

Verification and Validation

Commonly mistaken as the final stage in the development process, V&V activities should be integrated throughout the whole project lifecycle. You must be able to demonstrate that independent peer reviews have been carried out at every single stage of the development process. While this may not feel like the most valuable use of time, these verification activities provide an opportunity to highlight instances of missing or overlooked requirements, and that nothing extra is added.

A second important factor is the V&V plan. This documentation should be defined and recorded during the very early stages of a project to both describe the V&V activities that will be carried out throughout the project, and demonstrate how compliance with the designated safety standard will be achieved.

As you carry out your testing you should expect to see that every single one of your safety requirements has been met. In terms of our DOO example, you would be expected to force a 'freezing' incident with footage designed for that purpose and expect the software to return a result where the driver is alerted to the incident.

Once all your testing activities have been concluded, the very last thing you would be expected to do is produce a V&V report. The purpose of this report is to confirm that you have completed all of the activities that you outlined in the V&V plan and to provide the justification behind any incidents where a given activity was not carried out. Looking on into the future, if at any point a change is made to the software, a V&V report must be produced for each new version release. Though it may be additional effort, this ensures that the required lifecycle activities have been completed against any changes made and that the system continues to function as expected.

The next big question is, if the techniques outlined in this article produce such reliable software, why don't we apply them to every project? Here at Zircon we have developed a software development lifecycle, that combines the aforementioned techniques to be more agile as well as robust and SIL2 compliant.

References: