Industrial systems evolve as new technology is introduced and ageing equipment is upgraded.  In safety-critical applications, engineers must understand how those changes affect system behaviour and provide evidence that the safety requirements are met.

Small modular reactors (SMRs) are a clear example of innovation in a tightly regulated, safety-critical environment.  The UK's plans for an SMR fleet at Wylfa sit alongside growing global interest in this technology.  Delivering those ambitions requires substantial engineering, including dependable software, control systems and rigorous safety assurance.

Zircon works across rail, highways, aerospace, defence and industry.  We draw on that practical experience to adapt proven safety engineering methods to each project's hazards and requirements.

Safety assurance grounded in delivery

For an American rail grinding equipment supplier, we identified gaps against BS EN 50128, improved development processes and helped prepare documentation for a successful safety audit.  In another project, we independently tested railway software drivers against their requirements and assessed their effect on the existing system.

On a defence programme, Zircon connected Agile development with safety ass into practical engineering work.

What rail experience contributes

Rail assurance builds discipline in requirements traceability, fault analysis, verification and configuration control.  Its framework includes BS EN 50126 Parts 1 and 2 with their 2024 amendments, BS EN 50716:2023 for software, and BS EN 50129:2026 for electronic signalling systems.

EN 50716 brings signalling and rolling stock software into one development standard, superseding EN 50128 and EN 50657.  Existing systems still need a justified standards baseline and change assessment; a new edition does not automatically require redevelopment.

Applying that experience to nuclear software

SMRs and other nuclear power plants need dependable instrumentation and control (I&C).  IEC 61226:2020 categorises functions by their importance to safety and provides the basis for system classification.  IEC 61513:2026 addresses I&C architecture and safety lifecycles.

Software requirements follow the functions involved.  IEC/IEEE 60880:2026 covers software for systems performing Category A functions, replacing IEC 60880:2006.  IEC 62138:2018 addresses software in systems performing Category B or C functions.

A rail Safety Integrity Level (SIL) does not establish equivalence with a nuclear category.  The nuclear project's safety analysis determines its classification and required evidence.

In the UK, the Office for Nuclear Regulation's Safety Assessment Principles describe production excellence and independent confidence-building: examining how computer-based safety systems are developed and whether they fulfil their intended purpose.

Turning experience into engineering decisions

The useful transfer is in our engineering knowledge and judgement. Rail and defence experience gives us methods for examining issues that also matter in nuclear I&C, while the nuclear requirements determine how those methods must be applied. Examples include the following

Experience Zircon Brings Nuclear Engineering Application
Requirements traceability and verification Establish links between the plant safety functions, software requirements, design and verification evidence.
Fault analysis and test design Examine response times, fault detection and protective behaviour, including the effect of shared failures.
Software and tool configuration control Identify the versions, build tools and application data that must be controlled throughout the system lifecycle.
Assurance planning and independent review Plan verification and assessment around the project's independence requirements and UK nuclear expectations.

Common cause failure shows why this judgement matters.  Duplicating a controller can replicate the same software defect across every channel.  Architecture, separation and diversity therefore need scrutiny.  IEC 62340 addresses this risk for I&C systems performing Category A functions.

IEC 62671 provides an evaluation route for certain industrial digital devices with limited functionality.  Knowing when it applies helps focus assessment on the evidence needed.

Practical value for customers

We establish the application and its hazards, then agree a standards baseline with the customer's safety and design authorities.  That defines the evidence needed and who will accept it.

We then examine whether requirements can be tested, design assumptions are justified and verification covers important failure conditions.  Findings lead to specific work, such as requirements refinement, architecture changes, reverse engineering or additional testing.

We plan verification and assessment to meet the required independence, which may include independence from the supplier.  The relevant dutyholder and design authority retain responsibility for the overall safety justification.

Applying the same discipline to ageing systems

Consider a compiler replacement in a long-lived control system.  Requirements may stay unchanged while a new toolchain alters timing, generated code or assumptions behind earlier tests.  Controlled releases and verification help establish the evidence needed to justify the change.

That supports an informed choice between sustaining, adapting and replacing the system.  Safety must also be considered alongside other requirements, including nuclear cybersecurity under IEC 62645:2019.

Learning from other sectors

Our standards knowledge extends to airborne software under DO-178C, automotive development under ISO 26262-6, medical device software under IEC 62304 and space software assurance under ECSS-Q-ST-80C Rev.2.  Each framework has its own scope and assurance approach.

A focused first step

A fixed 10-day Zircon Discovery Review can examine available evidence, investigate unknowns and identify the next engineering activities.  Its findings inform the scope, risk allowance and quotation for subsequent work.  That work must demonstrate compliance and meet the system's acceptance requirements.

Whether you are developing a new system, resolving an assurance problem or sustaining an ageing platform, talk to Zircon about applying our engineering experience to your project.

Standards and public guidance checked on 30 October 2026.  A project's applicable editions, transition arrangements and acceptance requirements should be established in its standards baseline.